Slip-On Flanges

A slip-on flange slides over the pipe end and is fixed with two fillet welds, one inside and one outside. It is quicker to fit than a weld neck and tolerates small pipe-length errors, which is why utility and moderate-pressure lines specify it. We make them to ASME B16.5, EN 1092-1 Type 01, DIN and GOST flat welding flange tables or to your drawing, with an EN 10204 3.1 certificate per heat.

Also called: SO flange, slip on flange.

  • Slides over the pipe · fillet welds
  • ASME B16.5 · EN 1092-1 Type 01 · DIN · GOST
  • Carbon · low-temperature · stainless · duplex
  • Bore gauge check · MTC 3.1

Slip-On Flanges Technical Specification

Slip-On Flanges Technical Specification
StandardsASME B16.5 slip-on, EN 1092-1 Type 01, DIN and GOST flat welding flanges, or your drawing.
Grades
BoreSized to clear the pipe OD with room for the inside fillet weld; checked with a bore gauge.
DocumentsEN 10204 3.1 certificate per heat; 3.2 with a third-party inspector on request (example); PMI on alloy grades; UT, MT or PT and third-party witness where the specification requires them.
Volume and order sizeAbout 3,000 t of forgings a month across all grades; orders from 1 piece.
Typical serviceUtility and moderate-pressure lines, where quick fit-up and tolerance to small pipe-length errors matter.
Download this table as PDF Request a quote

Your standard, drawing revision and project specification govern.

FAQ

Slip-on or weld neck: which one?

A slip-on slides over the pipe and is held by two fillet welds; a weld neck is butt-welded through its tapered hub. Cyclic, high-temperature and high-pressure lines take weld necks; utility and moderate-pressure lines often take slip-ons. Side by side: Weld Neck vs Slip-On Flanges

Do you supply lap joint (loose) flanges?

Yes, with the stub end or collar: Lap Joint Flanges

Commercial terms

Orders from 1 piece · Free samples, you pay the freight · 30% deposit, balance when the goods reach the Chinese port you name · FOB, CFR or CIF

All commercial terms
Reply time
We reply to every RFQ within 8 hours.
Service hours
08:00–20:00 Eastern Time (ET; UTC−5, UTC−4 in summer), every day, including public holidays.
Minimum order
1 piece
Samples
Free of charge; you pay the freight.
Lead time
9 to 30 days after drawing approval.
Payment
30% deposit with the order; the balance is paid in full when the goods arrive at the port in China that you designate. The same applies to FOB, CFR and CIF.
Packing
Surfaces are coated with anti-rust oil. Most orders go in wooden cases, and every wooden case is fumigated. Large parts are steel-strapped onto pallets and wrapped in waterproof tarpaulin.
Quality claims
After you report a problem, we give you a handling plan within 8 hours.
Delivery terms
Standard: FOB the Chinese port you designate, Incoterms® 2020; we usually ship from Tianjin. On request: CFR or CIF to your destination port, quoted per RFQ. Other Incoterms® 2020 terms, except EXW and DDP, are quoted on request.

Send your RFQ or drawing directly to BLD Forge Direct.

Send your MR, datasheet or drawing as it is. We reply within 8 hours.

RFQ checklist

Request a quoteWhatsApp