Commercial terms
These terms apply to every flange and forging we supply, standard or made to your drawing.
- Reply time
- We reply to every RFQ within 8 hours.
- Service hours
- 08:00–20:00 Eastern Time (ET; UTC−5, UTC−4 in summer), every day, including public holidays.
- Minimum order
- 1 piece
- Samples
- Free of charge; you pay the freight.
- Lead time
- 9 to 30 days after drawing approval.
- Payment
- 30% deposit with the order; the balance is paid in full when the goods arrive at the port in China that you designate. The same applies to FOB, CFR and CIF.
- Packing
- Surfaces are coated with anti-rust oil. Most orders go in wooden cases with the IPPC mark: plywood cases that need no fumigation, or heat-treated or fumigated solid-wood cases. Large parts are steel-strapped onto pallets and wrapped in waterproof tarpaulin.
- Quality claims
- After you report a problem, we give you a handling plan within 8 hours.
- Delivery terms
- Standard: FOB the Chinese port you designate, Incoterms® 2020; we usually ship from Tianjin. On request: CFR or CIF to your destination port, quoted per RFQ. Other Incoterms® 2020 terms, except EXW and DDP, are quoted on request.